Government 3000 MW Solar Program: How to Apply
    ☀️ Government
    6 min read

    Government 3000 MW Solar Program: How to Apply

    Policy Analyst
    January 2025

    Complete guide to Bangladesh's 3000 MW rooftop solar program: application process, eligibility and benefits.

    Understanding the 3000 MW Solar Program

    The Bangladesh government has launched an ambitious 3,000 MW rooftop solar program as part of its Renewable Energy Policy and Vision 2041 targets. This initiative aims to transform rooftops across the country into clean energy generators, reducing dependence on imported fossil fuels while cutting carbon emissions.

    The program is coordinated by SREDA (Sustainable and Renewable Energy Development Authority) in partnership with local distribution companies (DISCOs) and financial institutions.

    Who Is Eligible?

    The program is open to a wide range of applicants across Bangladesh:

    • Residential homeowners with suitable rooftop space (minimum 100 sq ft for 1kW)
    • Commercial buildings including offices, shopping complexes, and restaurants
    • Industrial facilities such as garment factories, food processing plants, and warehouses
    • Government and institutional buildings including schools, hospitals, and mosques
    • Agricultural operations for solar-powered irrigation and cold storage

    Step-by-Step Application Process

    Applying for the 3,000 MW program involves several steps, but the process has been streamlined significantly in recent years:

    • Step 1: Contact your local DISCO (DPDC, DESCO, BPDB, etc.) and obtain the net metering application form
    • Step 2: Submit your application with property ownership documents, electricity bill copies, and proposed system design
    • Step 3: DISCO conducts a technical feasibility assessment of your premises (usually within 15 working days)
    • Step 4: Receive approval and install your system through an SREDA-certified installer
    • Step 5: DISCO inspects the installation and installs a bi-directional meter
    • Step 6: Sign the net metering agreement and start generating clean energy

    Financial Benefits Under the Program

    Participants in the 3,000 MW program enjoy multiple financial advantages. Net metering allows you to sell excess power back to the grid at retail rates, effectively using the grid as a virtual battery. Many banks now offer dedicated solar loans at 8-9% interest rates with up to 5-year repayment terms.

    The combination of reduced electricity bills, net metering income, and tax benefits means most installations achieve full payback within 3-4 years, with the system continuing to generate returns for 20+ more years.

    Common Challenges and How to Overcome Them

    While the program is well-designed, applicants sometimes face delays in DISCO approvals or meter installation. To minimize issues, work with an experienced SREDA-certified installer who can handle all paperwork, ensure your electrical system meets safety standards before applying, and maintain communication with your local DISCO office throughout the process.

    Need Help Applying?

    Our team has helped over 500 customers navigate the 3,000 MW program application process. We handle all paperwork, DISCO coordination, and installation. Contact us for a free consultation.

    Get a Free Site Survey

    Every roof is different. Tell us about your place and we'll send an itemized, no-obligation quotation.

    Related Articles